Piedra Road work to begin Monday

Posted

Work on a 1.35-mile stretch of Piedra Road is slated to begin Monday, Aug. 6.

That work will include the full-depth reclamation of the portion of road stretching from Ace Court to Cloud Cap Avenue.

The full version of this story is available in the print edition and e-edition of the Pagosa Springs SUN. Subscribe today by calling (970)264-2100 or click here.