Highway and safety improvements to begin Monday on U.S. 160 between Pagosa Springs and Treasure Falls

Posted

Special to The SUN

The Colorado Department of Transportation (CDOT) and contractor will begin a project on Monday, April 30, to resurface a 14.3-mile stretch of U.S. 160 from Pagosa Springs, at the U.S. 84 junction, mile point (MP) 144.29, to east of the Treasure Falls turnout, MP 158.56.

The full version of this story is available in the print edition and e-edition of the Pagosa Springs SUN. Subscribe today by calling (970)264-2100 or click here.